Building context
25 Finsbury Circus is the Grade II listed former 1–5 London Wall Buildings, overlooking Finsbury Circus Gardens near Liverpool Street. IJM’s published redevelopment plans retain and reconfigure the heritage property with a two-floor extension. The planned scheme provides 251,000 sq ft of net lettable area within 378,060 sq ft of gross internal area, across two basement levels, ground and eight upper floors.
Smart technology scope
Assessing a heritage building’s next technology brief
The owner’s proposed scheme includes advanced building systems, underfloor air distribution, heat pumps, energy-efficient lifts and LED lighting. These are design intentions for the redevelopment, rather than completed technology outcomes. For a building of this scale, technical assessment needs to establish the existing conditions, the proposed service requirements and the connections and responsibilities that a future smart-building solution would depend on.
- Existing-system assessment and requirements for the redevelopment brief.
- Coordination between the proposed smart-building service and building systems.
- Clear scope and technical responses for the tender and client discussions.
Anand’s contribution
Anand delivered technical assessments and supported tender and client-engagement activity for the property through Smart Spaces Global Ltd. His contribution brought a smart-building perspective into the assessment and procurement conversation: understanding the building context and helping establish how the proposed solution could fit the developing requirements.
- Technical assessment work for the property.
- Smart-building input to the tender and client-engagement process.
- Connecting assessment findings with the proposed technology approach.
Outcome and next milestone
Technical assessment to inform the redevelopment brief
The defining contribution was technical assessment and tender support for the building’s next stage. It provided a smart-building perspective for the developing brief and procurement discussions; the published redevelopment’s future systems and performance targets remain separate from this advisory milestone.
Project position · November 2026
Technical assessment and tender support; redevelopment technology outcomes planned
Building photography
Sources and further reading
Building scale and published technology features describe the wider project. Anand’s contribution is set out separately above.